
750 mm/30 inch CSD (keen sellers)
5 June 2025
236 m Floating Dock
24 June 202526,500 m3 Trailing Suction Hopper Dredger
2024 built, state of the art & versatile DP-1 hopper dredger, capable to operate on a variety of dredging, trenching & mining projects up to depths of 115 m. Finance can be arranged subject a due diligence. Only serious buyers to respond. Location: China. Enquire
General | |
Built | 2024 |
Class | CCS, ★ CSA Trailing Suction Hopper Dredger; Dredging within R1; DP-1, |
★ CSM AUT-0; G-EP(OIL1,SC,RC,NEC2,INC,RSC1,AFS); G-ECO(BWM(T)) | |
Dimensions | |
Length | 170 m |
Beam | 36 m |
Depth | 15.8 m |
Draft | 11.5 m @ dredging load line |
GT | ≈ 27,000 |
Dredging particulars | |
Hopper volume | 26,500 m3 |
Deadweight | 42,000 t @ dredging load line |
Speed | 13.5 knots |
Endurance | 20 days @ 85% MCR |
Dredging equipment | |
Dredge pipes | 2 x 1200 mm |
Dredging depth | 40 m / 70 m / 115 m |
Discharge method | 2 x 8 bottom door sets, |
bow connection, rainbow | |
Overflow | 2 x |
Machinery | |
Main engines | 2 x 7200 kW |
Propulsion | 2 x CPP in nozzles |
Bow thrusters | 2 x 1100 kW elec. drive |
Stern thruster | 1 x 1100 kW elec. drive |
Shaft generators | 2 x 7000 kW |
Main generator | 1 x 7000 kW |
Aux generator | 2 x 1800 kW, 1 x 500 kW |
Dredging machinery | |
Dredge pumps | 2 x 6000 kW |
Underwater pumps | 2 x 3300 kW |
Jet pumps | 2 x 2000 kW |
Deck equipment | |
Gantry crane | 45 t @ 6-30 m |
Accommodation | |
Cabins | For 40 crew, all en-suite |