Caisson Construction Dock
14 June 202481 tbp FiFi-1 Escort ASD tug (2 sisters)
18 September 2024Crane Barge, Grab Dredger, Spud Pontoon
Crane Barge, Grab Dredger, Spud Pontoon equipped with a tracked Liebherr HS 895 HD lattice boom crane. Location: Central America. Equire
General | |
Built | Pontoon 2006, Crane 2013 |
Class | BV, Hull, Special service, Grab dredger,- |
no propulsion, Unrestricted navigation | |
Dimensions | |
Length | 50.0 m |
Beam | 14.0 m |
Depth | 3.0 m |
Draft | 1.6 m |
GRT | 550 |
Mooring | |
Spuds | Fwd: 2 x 22 m, aft: 1 x 25 m |
Mooring / spud winches | 1 x 3-drum winch |
Max operating depth | on spuds: 18.5 m, on anchors: 42 m |
Grab | |
Lattice boom crane | Liebherr HS 895 HD |
Crane engine | 670 kW |
Buckets | Range: 3.2 m3 – 7.5 m3 SAE |
Related products
-
660 m³ Non-propelled Split Hopper Barge
IHC design. Class. Location: Med. Inquire
-
700mm (28″) Cutter Suction Dredger
For Charter only. 2008, IACS class, IHC design Cutter Suction Dredger. Suction dia: 28″ (700mm), Max dredging depth: 25 m, Length over all: 98 m. Total installed power: 6150 kW, 1600 kW underwaterpump , 1800 kW inboard pump, 750 kW cutter drive, Anchor booms, Spud carrier, Cutter platform, 17 men accommodation. Enquire
-
1.580 m³ Split Hopper Dredger
Direct from owners: Modified and well maintained. annual survey recently passed, 1 x 500 mm dredgepipe mounted with a underwater pump for improved dredging efficiency, l x w x d (m): 75.00 x 14.3 x 4.75, Draft dredging load line: 4.35 m. Location Baltic Sea. Available for world wide projects. For charter only: Inquire