
90 tbp DP-2 FiFi-1 ASD AHTS
2 octubre 2016
40 tbp Azimuth FiFi AHTS
2 octubre 201665 tbp FiFi-1 AHTS
2012, BV. Loa 50.0 m, width 13.20 m, depth 5.20 m, max draft 4.50 m. DW 750 tons. Deck Area 234 m2. Location: Far East. Price: Inquire
| GENERAL | |
| Built: | 2012 |
| Class: | BV, I + Hull + Mach Tug-Supply vessel- |
| Firefighting ship 1 -water spraying- | |
| Special service – Anchor handling vessel | |
| Unrestricted navigation + MACH | |
| DIMENSIONS | |
| Length Overall : | 50.0 m |
| Breath: | 13.20 m |
| Depth / Draft: | 5.20 m / 4.50 m |
| GRT: | 1095 |
| Deadweight: | 750 tons |
| Deck Space: | 234 m2 |
| Deck Strength: | 7 t/m2 uniform loading |
| PERFORMANCE | |
| Bollard Pull: | 65 ton |
| Max Speed: | 13 Knots |
| MACHINERY | |
| Main Engine: | 2 x CAT 3516B, 2575 bhp each |
| Main Generator: | 3 x Cat 18/Leroy Somer, 350kW each |
| Harbour Generator: | 1 x Cummins, 83kW |
| Gearbox: | 2 x Reintjes LAF 873L, |
| Propulsion: | 2 x CPP with kort nozzle |
| Bow Thruster: | 1 x 5 ton Kawasaki KT- 43B1 |
| DECK EQUIPMENT | |
| AH/ Towing Winch: | 1 x electro hydraulic double drum |
| Line Pull: | 150 ton @ 0.6 m/min ( low ) |
| Static Brake: | 200 ton @ 1st layer |
| Wire Rope: | 200 m x 52 mm(dia) for AH |
| 700 m x 52 mm (dia) for towing | |
| Tugger Winch: | 2 x 10 mt |
| Stern Roller: | SWL 200T, 5m (L) x 1.6m (Dia) |
| Capstan: | 2 x 5 tonnes @ 15m/min electro |
| Sharkjaw/Towpin: | SWL 200 tons |
| Reefer Points: | 4 units |
| Deck Crane: | 2 tons @ 6m |
| SAFETY EQUIPMENT | |
| External Fire Fighting: | 2 x 1,200 m3 hr ( FiFi 1 ) |
| Oil Dispersant System: | 2 x Cluster nozzles |
| Emergency Fire Pump: | Diesel driven, 50m3 @ 40m |
| Engine Room: | CO2 flooding system |
| Life Raft: | 6 x 20, SOLAS standard |
| Rescue Boat: | 1 x 6 men, 25hp |
| Fire Pump: | 80 m3/hrs @ 70m head |
| TANK/PUMP CAPACITY | |
| Fuel Oil: | 595 m3 |
| Fresh Water: | 215 m3 |
| Ballast/Bilge pump: | 50 m3/hr @ 40m head |
| Foam / Detergent: | 15 m3 / 15 m3 |
| FO and FW Pump: | 100 m3/hr @ 75m head |
| NAVIGATION / COMMUNICATION EQUIPMENT | |
| Radar: | 2 x Furuno, FAR-2117, 1942 MK2 |
| DGPS: | GP 150 |
| Eco Sounder: | Furuno FE-700 |
| Auto Pilot: | NP 60 |
| Magnetic Compass: | Saura M150 |
| Gyro Compass: | Simrad GC80 |
| Inmarsat C: | Furuno Felcom-15 |
| GMDSS: | Furuno RC 1800F |
| MF/ HF: | Furuno FS 1570 |
| Navtex: | Furuno NX-700B |
| EPIRB: | Jorton |
| SART: | Jorton |
| Speed Log: | Furuno DS-80 |
| Weather Fax : | Furuno Fax – 408 |
| PA System: | Phonetech SPA 1500 |
| ACCOMMODATION | |
| 1 Men Cabin: | 4 x 1-berth, 1 x 2-berth, 8 x 4-berth |
| Total: | 38 men |
| Hospital: | 1 man |






