
160 m3 Non-propelled Split Hopper Barge (2 sisters)
21 november 2020
Backhoe dredger (PC1400 equivalent)
18 januari 20216-PM Heavy Lift Work Barge (keen sellers)
Recent EU built (2014), solid design, recently dry-docked, well maintained and well equipped 6-point mooring Work Barge with 650 m2 hard wood deck protection, prepared for installation ballast system. Available for sale only. Earliest available Q4 2024. Location: South East Africa region. Enquire
| General | |
| Built | 2014 |
| Class | I ✠ Hull, pontoon, no propulsion |
| Unrestricted navigation | |
| Next SS due | March 2024 |
| Dimensions | |
| Length | 80 m |
| Beam | 26 m |
| Depth | 6.0 m |
| Draft (max) | 4.80 m |
| GT | 3,420 |
| Deck & Cargo capacity | |
| Deadweight | 7,900 t |
| Deck load | 15 t/m2 |
| Ballast system | Prepared |
| Deck equipment | |
| 6 point mooring | 6 x 90 t, 35 t pull |
| Anchors | 6 x 5 t Flipper Delta |
| Spuds | 2 x 24 m x 1.3 m |
| Smit brackets | 2 x fwd |
| Containers (20 ft) | 1 x office, 1 x control room |
| 1 x messroom, 1 x sanitary | |
| 1 x work shop | |
| Gas oil tank | 1 x 20 m3 |
| Protection | Crane mats |
| Boat landing | Optional |
| Machinery | |
| Generators | 2 x 90 kW |
| Power pack | 2 x diesel driven |
| Compressor | 1 x 20 m3/min, 7 bar, 1000 ltr vessel |
| Ballast pump | 1 x 150 m3/h, portable diesel driven |
| FiFi pump | 1 x 90 m3/h, diesel driven |
Gerelateerde producten
-
360 pax Accommodation / Work Barge
Unrestricted operation. ABS/IRS class. SPS compliant. 8-point mooring. Helideck, 350 ton lattice boom crane. Location: Gulf region. For Charter only. Inquire
- Hook-up and commissioning
- Subsea Pipeline and Construction Support
- Deep diving support
- Post trenching
- Shallow water & deep water applications
-
1.200 m3 Non-propelled Split Hopper Barge (2 sisters)
Class: BV. Location: Australasia, For charter only: Inquire
-
300ft Heavy Lift Barge (3 sisters)
2011/2012, ABS class, unrestricted navigation. Deadweight abt. 8,400 t. SE Asia. For Charter only: Inquire







